Gas Detection Technology / 2026-09-24
Article Summary
Choose methane survey equipment around route access and the inspection task. Vehicle-mounted equipment supports road-based patrol; portable equipment supports work that requires personnel to approach or investigate a location. A recorded methane indication needs an agreed follow-up process. Neither the equipment format nor a route map alone proves that a leak has been pinpointed, repaired or quantified. The selection process should therefore cover both patrol equipment and the records needed by the field investigation team.
When should a vehicle-mounted system be considered?
Consider it when the planned survey follows accessible roads and operators need route-based patrol records. The Hanwei system separates roof-mounted remote laser screening from front-mounted V8 or V9 extractive CH4/C2H6 detection, supported by positioning, wind data, onboard control and GIS / patrol software. Select V8 or V9 by sensitivity and range, not an assumed upgrade sequence.
Hanwei describes a roof laser, a front pump-sampling instrument, an onboard controller and a remote monitoring platform. Request the equipment list for the proposed vehicle.
- Describe the route length, road access, traffic constraints and available inspection vehicle.
- Ask how survey coverage and interruptions are recorded.
- Confirm methane-only or methane/ethane requirements and which functions are included in the offered configuration.
Are you equipping a fleet vehicle or specifying an unmanned patrol vehicle?
For an existing fleet, give the vehicle make and model, mounting space and power available. Ask who will design and install the mounts, route the front sampling line and connect the controller to the utility’s mapping system. For a complete vehicle, request a quotation that identifies the chassis, instruments, software and commissioning work separately.
This equipment list applies to the unmanned vehicle described in this source. Overseas fleet retrofits and complete-vehicle deliveries require their own scope.
- Hanwei’s unmanned patrol vehicle description names a VRLD200 roof instrument, a V9 vehicle instrument, positioning equipment, a wind instrument and an onboard tablet.
- If unmanned patrol is required, specify the proposed route, local operating permissions, operator supervision and how the vehicle will be recovered. Ask for written confirmation of the configuration and support available in your market.
Where does portable follow-up fit?
A route indication and a field investigation are different work stages. Plan how personnel will revisit an indication and record the investigation outcome. Select the portable instrument for its own measurement task rather than assuming that all handheld or portable gas instruments use the same method.
- Identify areas that cannot be reached by the proposed vehicle.
- Define the handover from patrol operator to field verification team.
- If ethane identification is needed, review a separately confirmed instrument and procedure, such as the relevant EGC200 configuration.
When to use an aerial methane survey
For an elevated pipe, a high storage area or a remote corridor, a road vehicle may offer a poor view and a walking team may have limited access. Hanwei describes a drone that carries a laser methane instrument and a camera. A utility can review the surveyed location and imagery, then assign a field team to investigate the indication. Before a pilot, agree which sections can be flown and how the operator will record gaps in coverage.

The report describes aerial screening. Select the payload and field verification method for the proposed route.
How can competing demonstrations be compared fairly?
Use a written demonstration scope that records the route, operating conditions, equipment configuration and expected outputs. Avoid comparing a sensitivity figure from one instrument with a distance or survey-speed figure from another as if they measured the same capability.
- Request the conditions and units associated with each performance claim.
- Agree how missed coverage, repeat passes and uncertain indications will be documented.
- Review the actual exported records and the steps needed to transfer them into the utility workflow.
What information should a gas utility send?
Provide the country, route environment, proposed vehicle, current survey method and follow-up process. Specify the required location and time records, receiving platform and report format. Hanwei can review vehicle-mounted laser inspection and adjacent equipment against those requirements; final performance and certification depend on the confirmed model.
- Request a configuration list, installation responsibilities and operator training scope.
- Keep screening, investigation, repair verification and emissions quantification as explicit tasks.
- Define a pilot acceptance plan before scaling the equipment purchase.